
Dolphin Electric
Electrician in Damascus, OH
Serving Damascus, OH & surrounding areas
40 years serving Damascus area
Dolphin Electric is an electrician serving Damascus, OH with residential generator installation, commercial generator installation, and solar installation. You get equipment sized to your electrical load, planning that accounts for future EV charging, and a contractor with 40 years in business.Call (330) 490-2067 for a free estimate.
If you’re looking for an electrician in Damascus, OH, you’re probably planning more than a quick repair. Homes and properties around US 62 and SR 173/534 are taking on bigger electrical loads: EV charging, solar panels, and backup power for the outages that rural lines bring.
Dolphin Electric has been in business for 40 years. We install residential generators, commercial generators, and solar systems. This page explains how those upgrades fit together and what to know before you start.

An electrician in Damascus, OH for EV-ready, solar-ready homes
Most modern upgrades compete for the same thing: capacity in your electrical panel. An EV charger, a solar system and a standby generator all connect through your service equipment, and each one changes how much load your panel can safely carry.
That’s why we plan the whole picture first. Before choosing equipment, it helps to know:
- The size and age of your main panel and service
- Which circuits you need to keep running during an outage
- Whether you plan to add EV charging, now or in a few years
- Where equipment can sit relative to the meter and the house
If an EV is in your future, tell us when you call. A generator or solar system sized without that load in mind can leave you short later, and it’s much cheaper to plan for it now than to rework a finished install.

Generator installation for homes and businesses
Outages hit rural areas hard. A standby generator starts on its own when the power drops and runs the circuits you’ve chosen through a transfer switch. The switch is the safety piece: it isolates your home from the utility lines so power never feeds back onto them.
Residential generators. A typical install has the generator on a pad beside the house, a conduit run to the transfer switch, and a fuel connection. Placement matters because clearances from windows, doors and the meter are set by code and the manufacturer.
Commercial generators. For a shop, farm operation or light-industrial site, the questions change. You’ll weigh what has to stay running, such as refrigeration, pumps, lighting or machinery, and what can wait. Starting loads from motors can be far higher than their running loads, so sizing takes care.
We install both residential and commercial standby generators.
Solar installation and planning for a solar-ready property
A solar system is only as good as the electrical work behind it. The panels get the attention, but the interconnection, wiring, disconnects and panel capacity decide whether the system runs safely and legally.
Goshen Township describes itself as non-zoned and mostly agricultural, so many properties around Damascus have open roof or ground space. That can make solar a practical option. Before you commit, we look at:
- Roof or ground area and how much sun it gets
- Your current panel and whether it needs an upgrade
- How your usage might change if you add an EV or other large loads
- How solar and a standby generator will coexist on one system
Solar by itself generally shuts down during a grid outage for safety reasons, so if backup power matters to you, pairing it with a generator or other backup plan is worth discussing up front.
Electrical work in Damascus: what local homeowners should know
Damascus is an unincorporated community in the 44619 ZIP code, not a city. It sits partly in southwestern Goshen Township, Mahoning County, and partly in northwestern Butler Township, Columbiana County. The 2020 census counted 418 residents.
That split matters for permits. On the Mahoning County side, electrical permits come from the Central Electric Bureau at 330-744-5238, and a county building permit is required first. If your property is on the Columbiana County side, permitting runs through that county instead, so confirm the requirements with them before work begins.
Landmarks like Damascus Grade School, built in 1902, Goshen Center Ruritan Park and the West Branch Local Schools show how spread out and rural the area is. Longer utility runs and open lots shape where a generator or ground-mount solar array can go. Call us and we’ll talk through your specific property.

How to get an electrical project started in Damascus
- Call and describe your goal Tell us whether you want backup power, solar, or both, and mention any EV plans. Call (330) 490-2067.
- Review your property and panel We look at your service equipment, where equipment could be placed, and which circuits matter most to you.
- Confirm permits for your side of the line We identify whether your property falls under Mahoning or Columbiana County permitting and what needs to be filed first.
- Install the system Equipment is set, wired through the proper switches and disconnects, and connected to your service.
- Test and walk through operation We confirm the system works as designed and show you how it behaves during normal use and outages.
Recent Projects in Damascus












Electrician in Damascus, OH: common questions
Is there an electrician near me in Damascus, OH?
Yes. Dolphin Electric serves Damascus, OH and has been in business for 40 years. We handle residential generator installation, commercial generator installation and solar installation. Call (330) 490-2067 to talk through your property and what you want to add.
What affects the cost of a generator or solar installation?
Cost depends on system size, the circuits you want covered, panel condition, distance from the equipment to your service, fuel connection and permit requirements. Solar also depends on roof or ground layout. We can't quote a number without seeing your property, so call us to start the estimate.
Do I need a permit for electrical work in Damascus?
Usually yes. On the Mahoning County side, a county building permit is required first, then an electrical permit from the Central Electric Bureau at 330-744-5238. The Columbiana County side falls under that county's permitting, so check with them before work starts.
How long does a generator or solar installation take?
It depends on the system and on permit timing. Permits and equipment lead times often take longer than the physical install itself. We can give you a realistic schedule after reviewing your property, panel and the permits your location requires.
Should I plan for an EV charger before installing solar or a generator?
Yes. An EV charger adds a large, steady load. If you size a generator or solar system without it, you may fall short later. Tell us about any EV plans up front so we can account for them when we review your panel and load.
Can a standby generator power my whole house?
It can, if the generator is sized for your total load, though many homeowners choose to back up only essential circuits. Starting loads from motors, plus any EV charging, affect sizing. We review your panel and usage to recommend what makes sense.
Dolphin Electric
11197 Cleveland Ave NW, Uniontown, OH 44685
- Monday – Friday 7am – 5pm
- Closed Saturday and Sunday
- After Hours Emergency Service Available
