
Dolphin Electric
Electrician in Paris, OH
Serving Paris, OH & surrounding areas
40 years serving Paris area
Dolphin Electric is an electrician in Paris, OH, installing residential standby generators, commercial generators, and solar systems for Stark County properties. With 40 years in business, we help you handle rising electrical demand, keep power on during outages, and offset what you buy from the grid. Call (330) 490-2067 to get started.
If you are looking for an electrician in Paris, OH, chances are your power needs have changed. More electronics, more heating and cooling, and a growing list of electric tools and vehicles all put more load on the same wiring and the same service.
Dolphin Electric has been in business for 40 years. We install standby generators for homes and businesses and design solar systems for properties along State Route 172 and across Paris Township. The goal is the same on every job: power that is reliable, sized correctly, and efficient to use.

An electrician in Paris, OH for rising home power demand
Many homes in the 44669 area were wired when a few circuits covered everything. Today a single household can run a heat pump, a chest freezer, a well pump, a home office, and an EV charger at once. A standby generator is one of the most practical ways to protect that load when the grid goes down.
We install residential standby generators with a properly rated transfer switch, so your home switches over safely and does not back-feed the utility lines. Before we recommend a size, we look at what you actually need to run. A generator that is too small trips under load. One that is too large wastes fuel and money.
- Load review to size the generator to your panel and your priorities
- Concrete or composite pad placement with correct clearances from the house
- Transfer switch and conduit installed to code
- Walkthrough of how the unit tests itself and what to maintain

Commercial generator installation for local businesses
For a business, an outage is lost sales, spoiled inventory, or a stalled shop floor. Commercial generator installation is about deciding what must stay running and wiring for it deliberately.
Some owners need the whole building covered. Others only need critical circuits such as refrigeration, point-of-sale systems, lighting, and data equipment. We help you sort out which approach fits, then size the generator and transfer equipment to the load you actually carry.
Demand also grows as a business grows. A new piece of equipment or a second location can push you past what your original electrical design handled. We plan with that in mind, so your backup power does not become undersized the next time you expand.
Commercial projects usually involve more coordination than residential ones. We work through the plans, permit requirements, and scheduling so your operation is disrupted as little as possible.
Solar installation to offset rising electricity use
Solar will not suit every roof or lot, but it can lower how much power you buy from the grid when the site is right. The first step is an honest look at your usage, your roof or ground space, and your existing electrical service.
Solar is an electrical project as much as a roofing one. The system ties into your panel, so the panel needs enough capacity and the connection has to be done correctly. We check that up front, and we can upgrade the service if it limits the project.
- Review of your usage and how it may change, such as a new EV or heat pump
- Evaluation of roof condition, shading, and orientation
- Panel and service assessment before design
- Installation and utility interconnection steps explained clearly
Pairing solar with a standby generator is also an option if you want both lower bills and outage protection.
Electrical work in Paris, OH: what local homeowners should know
Paris is an unincorporated community in Paris Township, Stark County, on State Route 172 between East Canton and Lisbon. It is part of the Canton–Massillon metro area, and customers in Robertsville and New Franklin often ask us about the same things.
The community was laid out in 1813, so some buildings in the older village area may predate modern wiring. If you are adding a generator or solar to an older structure, we check the existing panel and wiring first, because new equipment is only as dependable as the system it connects to.
Paris Township has no zoning, but Stark County’s Building Inspection Department covers the township’s unincorporated areas. Its permits include electric permits for new construction. The 2023 NEC applies to plans or permits submitted on or after March 1, 2024. We confirm what your specific project requires with the county and build to the code in effect.

How to get an electrician in Paris, OH
- Call or request a quote Reach Dolphin Electric at (330) 490-2067 and tell us whether you need a generator, solar, or both, and where the property is.
- Review your load and site We look at your panel, your major electrical loads, and where equipment would go, so recommendations match your property.
- Plan and permit We go over the scope with you and confirm permit requirements with Stark County Building Inspection before work begins.
- Installation and testing We install the equipment to code, test it under real conditions, and walk you through how it operates.
Recent Projects in Paris












Electrician in Paris, OH: common questions
Is there an electrician near me in Paris, OH?
Yes. Dolphin Electric serves Paris, OH and nearby areas including Robertsville and New Franklin. We have been in business for 40 years and focus on generator installation and solar. Call (330) 490-2067 to tell us about your property and ask about scheduling.
What affects the cost of a generator installation?
Cost depends on generator size, whether it is residential or commercial, transfer switch type, distance from the fuel source and electrical panel, pad work, and permit requirements. We give you a quote after reviewing your load and site, so you see what drives the price.
Do I need a permit in Paris Township?
Paris Township has no zoning, but Stark County's Building Inspection Department covers its unincorporated areas, and its permits include electric permits for new construction. Requirements vary by project, so we confirm with the county what your generator or solar installation needs before work begins.
How long does a generator or solar installation take?
It depends on the project's size, permit review, and equipment availability. A residential generator is usually a smaller job than a commercial system or a solar array. After we review your site, we give you a realistic schedule rather than a guess.
Can my older Paris home handle a generator or solar panels?
Often yes, but older wiring and panels need to be checked first. Paris was laid out in 1813, and some older buildings may have outdated electrical systems. We inspect your panel and service, and recommend upgrades only if the equipment needs them.
Which code applies to new electrical work in Paris, OH?
The 2023 NEC applies to plans or permits submitted on or after March 1, 2024, in Stark County's building inspection jurisdiction. We design and install to the code in effect for your permit, so your system is safe and ready for inspection.
Dolphin Electric
11197 Cleveland Ave NW, Uniontown, OH 44685
- Monday – Friday 7am – 5pm
- Closed Saturday and Sunday
- After Hours Emergency Service Available
